Designed with an utility corridor supporting
movement and all utility piping.
4 central columns in 60m x 60 m building. Entire factory is HVAC with 26 +/-2 C temp. HVAC for all areas including chilled water system, exhaust system and 3000 KW of electrical load etc.
25000 sqm built up area.
Year : 2020 - 2021