The factory is about 4000 sqm in area
including utilities and lab facility.
The powder plant with a high speed mixer was mounted on a steel structure in the high bay area. S&T provided vibration and dynamic analysis for this structure which is about 22 metres in height.
4000 sqm built up area on 10000 sqm plot area.
Architectural, Structural, Civil Utilities, Electrical, HVAC, Interior, Fire Protection, Contract Management, Site Supervision.
Year : 2021 - 2022