ABB INDIA LTD. (Now Hittachi Energy)

Design of greenfield facility for ABB India Ltd. at Savli on a
plot area of 1,20,000 square meters.

Dry transformers factory for ABB + GIS factory in same campus. Polished concrete for flooring used in 2011 which was a new concept in India. The facility has two manufacturing plants - GIS / Pass facility and dry type of transformers. The architectural features of the factory are consistent with ABB factories worldwide. Natural lighting has been provided in the continuous structural glazing in the factory as a continuous horizontal strip. The GIS / Pass factory has cross movements of cranes and high voltage testing facility. The floor has been treated with densification for the entire factory.

SCALE

15000 + 10000 sqm built up area.

SCOPE

Master Planning, Architecture, Civil and Structural, Peb Review and Tendering, Electrical, HVAC, Fire Protection, Contract Management of Contractors, Site Management / Supervision.

FACTORY DESCRIPTION
  • Turbine Factory - 50000 sqm,
  • GIS Factory - 10000 sqm,
  • Dry Type Transformer Factory - 15000 sqm,
  • Traction Transformers - 8000 sqm.
Savli

Year : 2011 - 2012

Scroll